Client Reviews
So you have a commercial office space that’s been in the dark ages. You work with old Microsoft computer monitors and you’re still working with a paper filing system.
“Cliff and his crew were very professional. They obviously were very knowledgable and took great pride in their work. Cliff offered some advice, which sometimes saved me money; sometimes not. When I changed things, he presented me with a new estimate, which I didn’t even request because I have worked with Cliff before and I trust him completely. He personally checked up on all the work as it was being done. They gutted my kitchen completely, then rebuilt it. All the floors in the house were tiled. I now have a “new” house I love. And after every workday, they cleaned any mess made. I have recommended Cliff to many of my friends, and if they were smart, they hired him”
Kaye Wood
“We will definitely use Crosspoint for our upcoming renovations. My home turned out how I envisioned, They added an office and remodeled my kitchen. living room and dining room. Cliff was upfront on price quotes and kept us abreast of the progress of the renovations. I also felt comfortable with the workers that were in and out of my home. I feel this company is conducting business with integrity and transparency which is why I would recommend them to anyone interested in renovating their home”
David Burgers
“We found Cliff on Houzz. Best decision we made. From the first meeting to the final inspection, Cliff was caring, professional, treated us with respect, and gave us confidence that we would be successful with this major remodel. His subs are also five stars, professional, courteous, and were great to work with. Our project included- new tile throughout, new kitchen, two new bathrooms, new baseboards, expanded archway, and painting the entire house. The remodel was completed in the time we were told. I would (and have) recommended Crosspoint to friends and neighbors”
David Burgers
“We hired Crosspoint Contracting to remodel our 20-year-old kitchen and guest bathroom. He remodeled the kitchen of friends of ours and they recommended him to us. We did new cabinets, new flooring (throughout the whole house), removed two walls, installed an island, new cabinet/vanity (changed from 2 sinks to 1) and flooring in the guest bathroom, and painted the entire main area of the house. Cliff, the owner, is excellent to work with. He keeps all appointments and is on time. He provided a detailed schedule of events and stuck to that schedule. If any issue arises, he is always in communication with you. Cliff went above and beyond getting us through 6 weeks of construction.
David Burgers
After shopping around for a contractor and receiving several bids, we decided to have Crosspoint Contracting work on our kitchen and living room remodel for the following reasons: tradesmen, design assistance, outlined estimate, and communication. We noticed right away that Crosspoint is dedicated to providing the best service possible when Cliff had each of the trades come out to our house. Not only did we meet the individuals that were going to be in our house, but they took the time to assess the amount of work that needed to be done and provided a reasonable estimate. They alerted us about possible problem areas and the cost of the repairs that might be needed. As we listened to their suggestions, it helped us generate a solid design for our new kitchen that included a few items we had not thought about such as under cabinet lighting and outlets. Their expert advice helped us create a kitchen that is not only beautiful but functional as well for many years to come.
Another positive characteristic of Crosspoint Contracting is its outlined proposal. All the items needed to be completed were listed under a general heading such as plumbing, flooring, and cabinets along with the cost for all of that work. We knew exactly how much we were going to spend for each of the services so if we did go over our initial estimate, we could account for it once the work was completed. This was something that was not offered by any of the other contractors we spoke with so it made our decision a little easier. Cliff was also very good at keeping us informed and answering our questions. We communicated through email most of the time, but he was available through text messages if needed.
The amount of work needed to be done was substantial but once they began the work, it only took them one month to complete our entire remodel. The different trades were scheduled to come out one at a time so everyone had space to complete the job effectively. Cliff made sure every part of the work was completed to his and our standards, which we greatly appreciate. We now have a kitchen and living room area that will accommodate our family’s needs for years to come. Thank you, Cliff and Crosspoint Contracting!